Before You Begin; Pre-Operation - Speedaire 45NW65 Instrucciones

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

BEFORE YOU BEGIN

Pre-Operation

Tool
Figure 1
UNPACKING
Contents:
Inspect:
Before connecting the tool to the air supply, clean the air hose of
accumulated dust and moisture. Before removing a tool for service or
changing accessories, be sure the air line is shut off and drained of air.
This will prevent the tool from operating if the throttle is accidentally
engaged.
Oil Here Daily
Air
Hose
Leader Hose
Nipple
Tool air inlet is 1/4" NPT threaded. Suitable couplers (not included)
may be used.
90 Degree Air Die Grinder
When unpacking the unit, carefully look for any damage that may have
occurred during transit. Check for loose, missing or damaged parts.
See General Safety Instructions on page 2, and Cautions and
Warnings as shown.
1/2" (or Higher)
Pipes and Fittings
Coupler
Oiler
Filter
1
Tabla de contenido
loading

Tabla de contenido