Installation

Supplies Required

• Teflon tape and pipe sealant
• Piping to 1" NPT water supply inlet
• Adequate supply pipe supports
• Minimum 4" (102 mm) drain to accommodate
30 gallons (115 liters) per minute discharge for
shower waste
• Sign-mounting hardware

Assemble components

1. Assemble the components as shown on page 4
(S19-120) or page 5 (S19-120A).
2. Apply pipe sealant to all male-threaded pipe joints.
3. Use the rubber grip pad provided or a strap
wrench around pipes when tightening to prevent
marring. Place the grip pad on the pipe, then put
the wrench over the grip pad and turn the pipe
with the wrench.
4. Bottom edge of showerhead should be 84"
(2134mm) from the floor.

Connect water supply

NOTICE! Do not rely on Bradley's Drench Shower to
support supply piping.
1. Connect water supply piping to 1" NPT inlet
on unit (piping supplied by installer). Provide
adequate supports (supplied by installer) for
supply pipe using pipe hangers or other means.
2. Mount the safety sign to the wall using sign-
mounting hardware supplied by installer.
All dimensions assume standard thread
engagement. Variations in manufacturing
allow for +/- 1/8" (3mm) per threaded joint.
To find the tolerance of a dimension, add
the number of thread joints in between a
dimension and multiply it by 1/8" (3mm).
Bradley • 215-148 Rev. Z; ECN 17-05-039
4½"
(114mm)
Ø 3.1"
(78.7mm)
84"
(2134mm)
to Floor
9"
(229mm)
S19-120
15¾"
(400mm)
6"
(152mm)
Ø 10¾"
(273mm)
84"
25½"
(2134mm)
(648mm)
to Floor
9"
(229mm)

S19-120A

7/18/2017
S19-120, S19-120A
15¾"
(400mm)
3
"
5
8
(92mm)
25½"
(648mm)
3
"
5
8
(92mm)
3
Tabla de contenido
loading

Este manual también es adecuado para:

S19-120a

Tabla de contenido