Master Plumber 123333 Manual Del Usuario página 6

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation
WELL POINT PUMP INSTALLATION
Materials needed in addition to Shallow Well General
Materials, for Well Points only
• Enough galvanized 1-1/4" pipe and unions to reach from
bottom of well to one foot above ground level
• One 1-1/4" galvanized elbow
• One 1-1/4" galvanized nipple
• One 1-1/4" check valve
• One 1-1/4" male PVC adapter
CASED WELL INSTALLATION
For parts or assistance, call Master Plumber Customer Service at 1-800-628-9439
STEP 1: Drive the well point into the ground according to
the instructions included with your well point. Use as much
galvanized pipe and unions as it takes to both reach the water
and leave approximately one foot of pipe protruding from
the ground.
STEP 2: Thread 1-1/4" galvanized elbow onto the pipe protruding
from the ground.
STEP 3: Thread 1-1/4" galvanized nipple into the 1-1/4"
galvanized elbow.
STEP 4: Thread 1-1/4" check valve onto the 1-1/4"
galvanized nipple.
STEP 5: Thread 1-1/4" male PVC adapter into the 1-1/4"
check valve.
STEP 6: FOLLOW STEPS 6–12 IN SHALLOW 4" DIAMETER CASED
WELL INSTRUCTIONS. Total installation should look like the
drawing below.
6123 1109
6
6124 1109
Tabla de contenido
loading

Tabla de contenido