Flame Engineering Red Dragon VT 3-30 C Manual Del Usuario página 2

Equipos de soplete de propano
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Assembly Instructions For Torch Kits
With a Standard Flame Adjusting Valve.
Note: Unpack and inspect for damage.
1. Using the thread compound capsule
supplied with torch kit, connect the
male end of the adjusting needle valve
to the female threaded end of the torch
handle. Tighten securely.
2. Using thread compound, connect
male end of the hose to the female end
of the adjusting needle valve. Tighten
securely.
3. Using thread compound,
connect the female end of the hose
to the 1/4" male end of the P-3200W
P.O.L. Tighten securely.
Parts List Diagram for Models: • VT 3-30 C • VT 2
Flame Adjusting Needle Valve
U.L. Listed LP Gas Hose
Parts List Diagram for Models: • VT 3-30 SVC • VT 2
Squeeze Valve w/ Adjustable Pilot
Handle
U.L. Listed LP Gas Hose
P.O.L. Fitting
2
Assembly Instructions:
P.O.L. Fitting
Male Adapter
P.O.L. Cap
Assembly Instructions For SVC Torch
Kits With a Squeeze Valve and Handle.
Note: Unpack and inspect for damage.
1. Using the thread compound capsule
supplied with torch kit, connect one
end of the male adaptor to the torch and
tighten securely.
2. Using thread compound, connect
the squeeze valve with adjustable pilot
to the other end of the male adaptor.
Tighten securely.
3. Using thread compound, connect
the handle grip to the sqeeze valve with
adjustable pilot. Tighten securely.
4. Using thread compound, connect
male end of the hose to the female end
of the handle grip. Tighten securely.
5. Using thread compound, connect the
female end of the hose to the 1/4" male
end of the P-3200W P.O.L. Tighten
securely.
1
/
-30 C • VT 2
2
Vapor Torch
P.O.L. Cap
1
/
1
/
-24 CE
2
Pipe Thread
Sealant or Tape Capsule
Spark Lighter
1
-30 SVC • VT 2
2
Pipe Thread
Packet or
Sealant Tape
Spark Lighter
/
-24 SVC
2
Tabla de contenido
loading

Tabla de contenido