Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 12
screw x1
iron wrench x1
one-line nut x10

Installation Steps

1. Connect and tighten the small slide and the big slide with iron screws.
Then install the big side panel A, B and the small side panel A, B, screw on
the small nut.
hello wrench x1
square non-slip pad x4
square screw x4
cross nut x21
04
2. Install the entire slide, large pedal, small pedal in turn, and then screw on
the one-line nut.
3. Connect the bottom support rod with the mainboard and cloud support
board. Connect the mainboard on the other side and screw the nut.
4. Finally, a basketball hoop is installed on one side of the mainboard
and the installation is completed.
05
Tabla de contenido
loading

Tabla de contenido