Connecting Equipment - LevelOne GSW-0509 Guía De Instalación Rápida

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 6
ENGLISH
Installation
Power
LED Indicator
Power
Link / Act
Status
LED Indicator
On
Power is on.
Power
Off
Power is off.
On
Port is connected
Blinking Transmitting / Receiving data
Link/Act
Off
Port is not connected

Connecting Equipment

Step1. Inspect the Power Adapter carefully, and make sure
that it is properly connected to a power source.
Step2. Plug-in the Power Adapter to the Switch.
Step3. Connect your network devices with the switch by
using Ethernet cable. (e.g. Cat-5e)
Meaning
3
loading

Este manual también es adecuado para:

Gsw-0809