Plug in the machine (switch must be in "OFF" position).
1. Switch on the machine (select "FOR" position).
Positions: OFF – Stop
FOR – Forward rotation
REV – Reverse rotation
2. Choose the soft shaft of 8 mm, 16 mm or 22 mm in accord with the pipe to clear and the
obstruction.
To use the drill of 8 mm, the white plastic sleeve of the back zone must be extracted and
introduce the connector of Ø 8 soft shaft.
The white plastic sleeve must be correctly placed with Ø 16, 22 soft shafts.
3. Select an appropriate drill and securely connect it to the soft shaft. It must be fixed to the spring
for joining them. In order to remove it, the user must insert the screwdriver and push it.
Introduce the spring by hand into the pipe until it stops (obstruction zone).
4. The handle has 2 positions:
- rest position (a): allow to advance and go back the soft, while it is not turning.
- pressed (b): the spring will start turning and will clear the obstruction zone.
5. Once the pipe is totally clean, extract the spring by hand into the machine taking care not to
introduce water or any other form of contamination into the machine.
6. Switch off the machine (select "OFF" position).
Unplug it of the mains.
1
4
(a)
(b)
OPERATING INSTRUCTIONS
2
5
3
6
6
7