EarthWise GS70015 Manual Del Operador página 9

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

5.
Snap the hopper ring onto hopper securely. (See Fig. 4a, 4b)
6. Fit the hopper (23) onto the upper feeding chute (5). Attach the buckle (24) to the retainer in the
upper chute; Fasten the buckles (24) on both sides and make sure the hopper is placed correctly
and securely (See Fig. 5a, 5b)
7.
Install collection box by pushing it into the frame beneath shredder body (See Fig. 6a, 6b)
Fig. 6a
ASSEMBLING
Fig. 4a
Fig 5a
9
Fig. 4b
Fig. 5b
Fig. 6b
Tabla de contenido

Solución de problemas

loading

Productos relacionados para EarthWise GS70015

Tabla de contenido