peerless-AV SA771P Instalación Y Montaje página 9

Idiomas disponibles

Idiomas disponibles

Cable Management
NOTE: Make sure cables have enough slack to
J
7
allow full movement of the arm.
Run power cable through top or bottom of arm (A)
B
and signal cable(s) through other side of arm in
order to avoid interference with the signal. Lock
cables into place by snapping cable covers (J &
B) onto mount as shown. Screen may have to be
moved for easy access.
Optional: If additional cable management is
required route cable ties (G) through slots of arm (A)
as shown in detail 3.
A
SLOT
G
CABLE
DETAIL 3
WALL PLATE RAILS
Snap wall plate covers (F) to top and bottom of wall
8
plate rails as shown.
F
9 of 32
ISSUED: 03-31-10 SHEET #: 095-9347-6 03-22-12