Installation
Step
1-4
: Under-Counter Installation:
After repeating Part 1 above, attach the
PDU to a stable mounting surface by
inserting four user-supplied screws
through the PDU mounting brackets
and into secure mounting points on the
mounting surface.
Step
2
: Connect PDU to a Properly
Grounded Power Source: The
PDUH20DV includes an IEC-320-C19 to
IEC-320-C20 cord set
320-C19 to NEMA L6-20P adapter
this cord set to attach the PDU to a C19
or L6-20R power source such as a Tripp
Lite UPS System. When using the L6-20P
adapter, secure the connection with the Cord
Retention Bracket
bolts to fasten the two halves of the bracket
around the connection as shown.
The PDUH20HVL6 comes with an attached
NEMA L6-20P input plug. Attach this plug
to a properly grounded AC outlet or to a
Tripp Lite UPS System.
Note: Connect input plug to an AC outlet that does not
share a circuit with a heavy electrical load (such as an
air conditioner or refrigerator).
Step
3
: Connect Equipment to PDU:
Connect equipment to the PDU with user-
supplied IEC-320 interconnection cords.
Be careful not to exceed the load rating for
each outlet nor the total load rating for the
PDU.
14-02-329-933047.indb 4
(continued)
A
B
and an IEC-
D
. Use
E
by using the included
F
C
1-4
D
E
2
3
4
B
C
A
F
4/23/2014 3:39:25 PM