Arrow MT300 Manual Del Usuario página 4

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

ASSEMBLY
Your MT300™ comes fully assembled
OPERATION
IMPORTANT OPERATION NOTICE
1 When first using your new glue gun it will take one stick of glue to fill the melt
chamber before glue begins to flow out.
If, when squeezing trigger, glue does not enter gun easily, do NOT continue to squeeze
trigger. Glue chamber may not be hot enough to melt glue fully.
Excessive squeezing of trigger will cause hot glue to back up and flow out of rear of
gun, possibly causing severe burns.
2 Insert 5/16" (8mm) dia. glue stick through tunnel at back of gun.
3 Plug cord into an electrical outlet and wait 5 minutes to heat up the glue, then apply
adhesive by continuous pressure on trigger.
4 Release trigger to stop the flow of glue. Apply pressure for approximately 60 seconds
for complete bonding.
5 Bead gluing – For most jobs
6 SNAKE PATTERN – For Cartons, Corrugated Board, Foam Board
BACK TO
INDEX
4
Tabla de contenido
loading

Tabla de contenido