Pre-Installation; Tools/Materials Required - Aria QBV050 Manual Del Usuario

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Pre-Installation

TOOLS/MATERIALS REQUIRED (NOT SUPPLIED)
Measuring tape
Aluminum foil tape
Safety gloves
Drywall saw
Respiratory mask
Duct adapter*
*For best performance use 3" round metal ducting . Other ducting is acceptable but may impact performance . Use of existing metal
ducting will require a short flexible duct connector. If your ducting is other than 3" in diameter, a duct adapter is required to make an air
tight connection .
QBV050
All manuals and user guides at all-guides.com
4
Utility knife
Phillips screwdriver
Electric drill
Pry bar
Cable clamp
Pencil
Needle nose
pliers
Safety goggles
Wood screws
Flexible duct
connector*
Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

20191213

Tabla de contenido