The fitting plate is fixed into the work surface. It is then ready to receive,
in order :
1. the anti-emulsion oil bowl
2. the heating element, which you pivot on its hinge towards the bottom, in
order to position it in the bowl
3. the basket.
3. Assembly
GB
27