Installation Requirements
Tools and Parts
Parts Supplied
CAUTION
Remove the carton carefully. Wear gloves to protect against sharp edges.
WARNING
Remove the protective film covering the product before putting into operation.
•
Hood canopy assembly with blower and LED lamps already installed.
•
6" (15.2 cm) round air transition.
•
Duct covers.
•
Hardware bag with:
Tools/Materials Required
•
Level
Drill with 1¼" (3.2 cm), ¹ ⁄₈" (3.2 mm), and ³⁄₁₆" (4.8mm) drill bits
•
•
Pencil
•
Wire stripper or utility knife
•
Tape measure or ruler
•
Pliers
•
Caulking gun and weatherproof caulking compound
•
Jigsaw or keyhole saw
•
Metal snips
•
Phillips and flat blade screwdrivers
Part
Qty
5 x 45 mm
8 x 40 mm
3.5 x 9.5 mm
4 x 8 mm
10 x 60 mm
Part
6
5.4 x 75 mm Screws
(for 10 x 60 mm Wall Anchors)
2
Torx 10 Adapter
2
Duct Cover Bracket
4
Mounting Template
4
Qty
4
1
1
1
ENGLISH
9