Barrette WEB-REV 5.21 Guia De Inicio Rapido página 3

Idiomas disponibles

Idiomas disponibles

1.
Determine Latch Specifications for Clearance:
a. The Heavy-Duty Floating Bar Gravity Latch
requires a latch clearance of 1½"-4" and works
with a post size of 2"+ and upright size of 3"+
(Fig. 1).
2.
Determine Latch Location:
NOTE:
Latch should be on the same side as the hinges.
a. With gate closed, align latch on post and mark
screw locations (Fig. 2).
b. Align striker and striker bracket on gate. Striker
bracket should be no more than ½" above latch
to allow for gate sag. Mark screw locations
(Fig. 3).
3.
Mount Latch on Post:
a. Drill 5/32" pilot holes on the post for latch
location (Fig. 4).
b. Install latch to post with provided screws and
tighten.
4.
Mount Striker on Gate:
a. Drill 5/32" pilot holes on the gate for striker
bracket location. Lower middle hole should be
drilled for striker (Fig. 5).
b. Install striker to gate with provided screws and
tighten (Fig. 6). Striker bar screw should not be
overtightened to allow bar to "float" or move.
Fig. 1
2"+
3"+
Post
Upright
1½" to 4"
Latch
Clearance
Fig. 2
Fig. 3
1
2 "
Fig. 4
Fig. 5
Hole for
Striker
Fig. 6
3
loading

Productos relacionados para Barrette WEB-REV 5.21