A licensed electrician should install a four-wire electrical service (two line voltages, one neutral, one ground) from
the main electrical service panel to the subpanel, and from the sub-panel to the spa per the appropriate wiring
diagram as illustrated below.
Your electrician should mount the subpanel in the vicinity of the spa but it should not be closer than five (5) feet
from the spa water edge (NEC 680-38 to 41-A-3).
INSTALLATION NOTE: After the spa has been installed, your electrician can connect the conduit from the
subpanel to the spa's control box and then complete the wiring connections in the control box.
NOTE: Complete step-by-step Installation and Wiring Instructions for 230 volt configuration are included in the
Owner's Manual and with each sub-panel.
WARNING: Removing or bypassing the GFCI breakers in the subpanel at any time will result in an unsafe spa and
will void the warranty.
WIRE SPECIFICATION NOTE: Long electrical runs may require a larger gauge feed wire than stated. All wiring
must be copper to ensure adequate connections. Do not use aluminum wire.
Refer to the Wiring Diagrams below for the electrical requirements of the 230 volt models.
From the House
Breaker Box
x
230V Wiring Instructions:
4 Wires/Minimum 50 amp GFCI Breaker #8 AWG 75°C
Copper Wire Minimum (less than 100' (30 m) length)
Special Note:
If the GFCI breaker trips immediately after attempting
to turn on, please check the White Neutral Wire that is
connected to the spa. See figure below.
White Neutral Wire that is connected to Spa Neutral goes HERE.
To the Spa
Page 21
Page x
Red
White
Black
Green
Pre-Delivery Guide
x