1
4
1.- Remove the packaging before using the appliance, check the inside of the kettle.
2.- Remove all the elements inside the box.
3.- We recommend filling the kettle up to the MAX symbol with cold water and boiling it at least
4 times in order to eliminate any type of dirt generated during the manufacturing or assembly
process before using the kettle for the first time.
4.- To boil the water inside the kettle:
a.- Open the lid (1) by means of the opening button (2) (Image 1).
b.- Fill the kettle with water respecting the MIN and MAX levels and close the lid
(Image 2)
NOTE:
c.- Place the jug on the heating base (7) (Image 3).
d.- Press the on/off button (4). The button should stay in the upper position.
The operating light (6) will come on, indicating that the device is working (Image 4).
5.- In a few minutes, when the water starts to boil, the operating light will turn off automatically,
indicating that the kettle has switched off (Figure 5).
6.- If you want to turn off the device before it turns off automatically, press the on/off button
into the lower position. Do not remove the kettle from the heating base until the appliance is
switched off.
7.- Remove the kettle from the base and pour the water into the desired container.
8.- To boil water again, place the kettle on the heating base and press the on/off button again.
OPERATION
2
We recommend using filtered water to avoid the accumulation of
limescale inside the kettle.
3
5
33