21 electrolux description
Description
3
1
2
4
5
6
7
Panel
1
Push button of cold water
2
Push button of normal water
3
Push button of hot water
4
Spout
5
Front carapace
6
All manuals and user guides at all-guides.com
8
10
9
11
12
13
Water collector
7
8
LED night switch
9
Heating switch
10
Cooling switch
Power cord
11
12
Condenser
13
Outlet of hot water
Installation
Locate dispenser
1. Place dispenser upright.
2. Locate dispenser on a hard and
level surface in a cool shaded
location near a grounded wall
outlet. Do not plug in power cord
yet.
3. Position dispenser so the back is at
least 20 cm from wall and there are
at least 20 cm of clearance on both
sides.
Assemble
1. Remove drip tray from door and
place the grid on top.
2. Snap drip tray and grid assembly
into door.
Install water bottle
1. Open dispenser door.
2. Place probe assembly on probe
hanger.
3. Place fresh bottle outside of
cabinet.
4. Remove the entire plastic cap from
top of bottle.
5. Clean outside of new bottle with a
cloth.
6. Place probe into bottle.
7. Slide collar down until it clicks in
place.
8. Push head down until tubes hit
bottom of bottle.
9. Slide bottle into cabinet and close
door.
Provide electricity
Plug cord into a properly grounded
wall outlet.
At this time the pump will begin to
move water from the bottle to the hot
and cold tanks. It will take up to 12
minutes to fill the tanks for the first
time. During this period the pump will
run continuously. This is normal.
installation electrolux 22
Head
Collar
Head
Collar