Installation Procedure - Rockwell Automation Allen-Bradley SLC 5/01 Instrucciones De Instalación

Ocultar thumbs Ver también para Allen-Bradley SLC 5/01:
Idiomas disponibles
  • ES

Idiomas disponibles

All manuals and user guides at all-guides.com
6
SLC 5/01™ and SLC 5/02™ Modular Processors
For general recommendations concerning installation safety requirements and
safety related work practices, refer to the requirements specific to your region.
• Europe: Reference the standards found in EN 60204 and your national
regulations.
• United States: refer to NFPA 70E, Electrical Safety Requirements for Employee
Workplaces.
IMPORTANT
Hazardous Location Considerations
This equipment is suitable for use in Class I, Division 2, Groups A, B, C, D or
non-hazardous locations only. The following WARNING statement applies to use in
hazardous locations.
EXPLOSION HAZARD
WARNING
!

Installation Procedure

Install the Battery
IMPORTANT
Publication 1747-IN011B-MU-P - July 2002
See page 11 for information on proper battery handling,
storage, and transporting.
• Substitution of components may impair suitability for Class
I, Division 2.
• Do not replace components or disconnect equipment
unless power has been switched off or the area is known to
be non-hazardous.
• Do not connect or disconnect components unless power
has been switched off or the area is known to be
non-hazardous.
• All wiring must comply with N.E.C. article 501-4(b).
If your processor has a battery— the battery is an option for the
SLC 5/01 (1747-L511) processor — make sure it is connected
before installing your processor into the chassis. This provides
memory backup for your processor should the controller power
supply fail.
loading

Este manual también es adecuado para:

Allen-bradley slc 5/021747-l5111747-l5141747-l524