Columbia COCA2135 Guia De Inicio Rapido página 2

Juego de tocador
Idiomas disponibles

Idiomas disponibles

1
VANITY INSTALLATION
1. Place vanity cabinet (A) into desired location.
Check if the vanity is level from front to back
and side to side.
2. If the vanity needs leveling, place wood shims
(not included) under the vanity to level it.
3. Check for level again.
4. Using screws (not included) secure cabinet to
wall.
5. Trim off any exposed shims.
2
CHINA TOP INSTALLATION
1. Place a bead of latex caulk around the top edges
of the vanity.
2. Carefully place the vitreous china top (B) onto
vanity. Wipe off excess caulk with a damp
sponge. Allow the caulk to completely dry.
3
DRYING TIME
1. Avoid moving the vitreous china top and allow
the top to dry for at least 24 hours to allow for
proper top adhesion to the vanity.
4
KNOB INSTALLATION
1. Place machine screws through predrilled hole in
door or drawer. Line up knob with machine screw
and tighten with screw driver.
2. Repeat process for all additional doors and/or
drawers.
2
All manuals and user guides at all-guides.com
Please read instructions before assembly process
Figure 1
Figure 2
Figure 3
Figure 4
A
Figure 1
B
Figure 2
Figure 3
Figure 4
A
B
loading

Este manual también es adecuado para:

Coea2135Cowa2135Cocat1816Coeat1816Cowat1816Cocat2418 ... Mostrar todo