Installation Steps - Price Pfister R89 Serie Guia De Inicio Rapido

Ocultar thumbs Ver también para R89 Serie:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Thank you for purchasing this Price Pfister product. All Price Pfister products are carefully engineered, and factory tested to provide long trouble-free use under normal
conditions. This product is easy to install using basic tools and our easy to follow illustrated instructions. If you have any questions regarding your product installation
call 1-800-Pfaucet (1-800-732-8238).
1 BEFORE PROCEEDING
WARNING: Read all the instructions completely before proceeding.
Price Pfister recommends calling a professional if you are uncertain about
installing this product!
This product should be installed in accordance with all local and state plumbing
and building codes.
WARNING: This product has been designed for use with the Price Pfister
0T8-410 series thermostatic valve. It will not work with any other product.
Please review the 0T8-410 valve installation instructions before installing this
product.
2 SHUT OFF WATER SUPPLY
Locate water supply inlets and shut off the water supply valves. These are
usually found near the water meter. If you are replacing an existing unit, remove
the old unit and clean the mounting surface thoroughly.
3
3 TOOLS RECOMMENDED
• PTFE plumber's tape or thread sealant
• Phillips head screwdriver
• Adjustable wrench
• Flashlight
• Cloth
Your installation may require additional tools.
4
B
C
D
E
4 CHECKING THE CONTENTS OF THE BOX
Upon opening the box, check to ensure that all of the following items are
included.
A Gasket & Trim Flange
C Temperature Knob
E Button
If any of these items are missing, please contact Price Pfister Consumer Service
at 1-800-Pfaucet (1-800-732-8238).
ENGLISH
• Pipe wrench
A
B Retainer Sleeve
D Set Screw

INSTALLATION STEPS

5
5B
5A
5 PLASTERGUARD REMOVAL
Remove Screws (5A), and Plasterguard (5B) from Valve Body (5C). Remove
Set Screw (5D) from Valve Body (5C) and save. Remove Plug (5E) from
Valve Body (5C).
6
6E
6 FLANGE ATTACHMENT
Place Sleeve (6A) onto Valve Body (6B). Position Sleeve (6A) so that Hole
(6C) is aligned with Valve Hole (6D).
Slide Flange (6E) onto Sleeve (6A) with Drain Hole (6F) at the bottom until is
snug to finished wall surface.
2
5C
5E
5D
6B
6A
6D
6C
6F
Tabla de contenido
loading

Este manual también es adecuado para:

R89-9thkR89-9thc

Tabla de contenido