Technical Data - Grohe BauLoop 19 593 Guia De Inicio Rapido

Tabla de contenido
Application
Operation is possible in conjunction with:
- Pressurized storage heaters
Operation is not possible with:
- Low-pressure storage heaters
(displacement water heaters)

Technical data

• Max. flow
- Spout
- Handshower
• Flow pressure
- min.
- recommended
- greater than 72.5 psi, fit with pressure reducing valves
• Max. operating pressure
• Test pressure
• Temperature
- max. (hot water inlet)
• Water connection
Note
Major pressure differences between cold and hot water supply
should be avoided.
Installation
See dimensional drawing on page 1.
Flush piping system prior and after installation of faucet
thoroughly!
Side valves, see fig. [1] and [2].
• Valve with a groove on the top edge of the headpart (A) and
in addition marked with COLD should be mounted on the
right (cold water) side.
• Valve without a groove on the top edge of the headpart (A)
and in addition marked HOT should be mounted on the left
(hot water) side.
1. Screw the mounting set (B) to the bottom of the thread of the
side valve (C).
Make sure that the rubber washer (B1) is on the top of the
fiber washer (B2).
2. Insert the side valve (C) through the basin hole from below.
3. Place the escutcheon O-ring (D1) on the basin and screw
down the escutcheon (D) until it stops.
4. Tighten the mounting set (B) from below to secure the valve.
5. Close the headparts (clockwise for the hot side and counter-
clockwise for the cold side).
Install the lever (E) to the stem of the headpart (A) and be
sure that the lever points away from the spout.
6. Attach the hoses (C1) and (C2) to the side valve (C).
approx. 40 l/min or 10.5 gpm/45 psi
max. 9.5 l/min or 2.5 gpm/45 psi
14.5 - 72.5 psi
cold - Right hand
hot - Left hand
English
Spout, see fig. [3].
1. Place the O-ring (F) on the tub deck and insert the spout (G)
from above.
2. Secure the spout with the mounting set (H).
3. Install the diverter (J) to the spout, gently guiding the lift rod
assembly (K) up through the center of the spout (G).
4. Tighten the lift rod knob ( L) to lift rod assembly (K).
5. Attach the hoses (J1) and (J2) to the diverter (J).
Handshower, see fig. [4] and [5].
1. Install the escutcheon (M) onto the guide (N), see fig. [4].
2. Install the guide (N) through the mounting surface, insure
7.25 psi
the escutcheon washer (N1) is in place.
3. Secure with mounting set (O).
4. Insert shower hose (P) through guide (N) from below.
145 psi
5. Screw tapered nut (Q) onto shower hose (P).
232 psi
6. Insert seal (Q1) into the tapered nut (Q) and screw hand
shower (R) into tapered nut (Q).
176 °F
7. Install shower hose (P) with hose (S), see fig. [5].
Connect wideset, see fig. [5].
Connect the side valves to the water supply. Insure the
supplied washers are used for all connections.
The cold water supply should be connected on the right side
valve (marked blue) and the hot water supply to the left valve
(marked red).
Open cold and hot water supply and check connections
for leakage!
Maintenance
Inspect and clean all parts, replace as necessary and grease
with special grease.
Shut off cold and hot water supply.
I. Ceramic headpart, see fig [6].
1. Remove lever (E).
2. Unscrew the ceramic headpart (A) using a 17mm wrench.
3. Change complete ceramic headpart (A) or O-ring (A1).
Observe the different replacement part numbers of the
headparts, see page 2.
II. Flow regulator, see page 2.
Unscrew and clean flow regulator (13 905).
III. Check valve, see fig [3].
1. Disconnect hose (J2).
2. Remove check valve (T).
Assemble in reverse order.
Replacement parts, see page 2 ( * = special accessories).
Care
Instructions for care of this faucet will be found in the Limited
Warranty supplement.
4
Tabla de contenido
loading

Este manual también es adecuado para:

Bauloop 19 594

Tabla de contenido