INSTALLATION IN SOURCE STONES
• Before starting the installation, disconnect the pump and the QUELLSTAR 2000 LED from the mains.
Control if the source stone is fi tted fi rmly.
• Pull the power cable through the drilling hole of the source stone and put one end of the hose connection
with a turning movement onto the fi tting of the QUELLSTAR 2000 LED.
• Pull the spiral hose, too, through the drilling hole of the source stone and countersink the QUELLSTAR
2000 LED approx. 15 mm into the source stone.
• Connect the other end of the spiral hose to the pump.
• Now put the pump and the QUELLSTAR 2000 LED into operation.
12
ENGLISH