Palram OLYMPIA 3x3.05 Instrucciones De Montaje página 90

Ocultar thumbs Ver también para OLYMPIA 3x3.05:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 95
Notes During Assembly
Use a soft platform below the parts to avoid scratches and damages.
Please note you install the panels with the UV protected side out (marked with "THIS SIDE OUT")
remove plastic film before inserting panels and locking in place.
If the panels received with the product are clear / white, please remove only the plastic sticker as panels are locked in place.
Product dimensions can be adjusted to your specific needs:
1. The wall -mounting profile (top -back) can be adjusted from 260 to 305 cm (102.4" to 120") above ground. The adjusting is done
when measuring and drilling (Step 5).
Please note the installation recommendations' height suggested in Diagram A.
Please note that the product appearance may slightly change as a result, however snow load weight does not change.
2. Poles distance from the wall can be adjusted from 226 to 286 cm (89" to 112.6") as suggested in Diagram B1.
Poles distance from the side edges can be adjusted from 5 to 54 cm (2" to 21.6") as suggested in Diagram B2.
The adjusting is done after assembly and before anchoring (Step 24) by sliding poles and profile 7040+7041 at the roof profiles'
channels.
3. Wall mounting and distance from the wall determine the roof angle and the total depth of the product (distance of gutter from
the wall). Higher wall mounting and shorter distance between wall and poles increase the roof angle and shorten the total depth as
suggested in Diagram C.
Steps
Step 7: It is important to plan the installation area, mark as per the instructions and level the surface prior to the assembly.
Make sure you use suitable screws and anchors.
Step 13: Please apply silicone sealants above beam 7288 + 7290, in order to prevent water from seeping in.
Step 15: Make sure that the angle between the back wall profile and the panel supporting profiles is 90 degrees.
Step 17 + 18: Please note you install the panels with the UV protected side out (marked with "THIS SIDE OUT")
remove plastic sticker as panels are locked in place. If the panels received with the product are clear / white, please remove
only the plastic sticker as panels are locked in place.
Step 21b: Please apply silicone sealants on both sides of the part combining 8071 & 8072 in order to prevent water leakage,
as shown at the drawing 19b.
Step 22a: Please apply silicone sealants on the inner part of 7997, and connect to the profile as depicted in drawing 20a.
Step 22c: Please do not tighten screw 4043 yet, in order to allow the final adjustments done in step 24b.
Step 24a+24c: Please adjust the poles (inside out and sideways) by sliding them to their final position prior to anchoring. Make
sure that the poles distance from the Patio cover side edge does not exceed 54 cm/21.3".
Step 24b: Please adjust the gutter head's angle according to your needs and tighten screws 4043.
Step 26: Anchoring this product to the ground is essential to its stability and rigidity. It is required to complete this stage in
order for your warranty to be valid.
*Tighten all screws when completing assembly.
Note:
The wall anchoring kit supplied with this product is suitable for concrete or solid brick walls
only. Other wall types need an accordant wall fixation kit.
260-305cm
102.4"-120"
226-286cm
89"- 112.6"
..
- 13°
.
.
.
+ 17°
,..
+
Tabla de contenido
loading

Tabla de contenido