9
pop out the first wiring access slug. Use second if needed.
For New Construction - suspended between joists go to step B11, page 8
For Existing Construction - accessible from above go to step C11, page 11
For Existing Construction - accessible only from below go to step D11, page 15
New Construction - attaching to joist
A11
5/8
1/2
position the correct depth mark at the bottom edge of the
joist based on the thickness of your sheetrock.
011_41949_EngS_2-12-08.indd 5
Choose Installation Option
For New Construction - attaching to joist go to step A11, page 5
F
41949-01 02/12/2008
10
F
B
Insert the strain relief (not Included) into the housing
and secure with washer.
A12
5/8
1/2
Screw pre-loaded screws into joist or framing.
5
C
2/12/08 2:43:30 PM