POWER BOX 1 CLI 1 PHASE
POWER BOX 1 comes precabled.
Cliente must open the box and
make the connections within the
box and to the other components
500mm length out of the box.
This cable must pass through
L
POWER BOX 2 CLI 3 PHASES
Mains input cable supplied by the client.
Cliente must open the box and
make the connections within the
box and to the other components
M
CABLE DUCT
00-72-755 | DOC-0016439 Rev B | 03-2019
3G2,5
Pole grounding cable.
the M12 Cable gland.
Pole grounding cable.
500mm length out of the box.
This cable must pass through
the M12 Cable gland.
www.schreder.com
3G2,5 Cable
supplied
by Client
Power Box Model
Sogexi Lacroix
Aquapak AQ96
Mains Input Cable.
This Cable must come
in through the 25 cable
gland in the bottom.
5G2,5 Cable
supplied
by Client
Power Box Model
Sogexi Lacroix
Aquapak AQ96
Mains Input Cable.
This Cable must come
in through the 25 cable
gland in the bottom.