Approved installation positions TE1
TE1 procedure:
Rinse the pipeline thoroughly.
1
Close the shut-off valves in the inlet and outlet.
2
Unscrew the temporary cover or old meter anti-clockwise.
3
Clean the connector's sealing surfaces and the measuring capsule's O-ring.
4
Grease the connector's sealing surfaces lightly with tap grease.
5
Screw the measuring capsule hand-tight into the connector and tighten it by
7
max.
1
/
turn with the Techem hook spanner.
4
Turn the computer unit to a position in which it is easily readable.
8
Approved installation positions IST
Steps
to
and
1
4
Apply a thin layer of tap grease to the measuring capsule's screw thread and small
5
O-ring as well as the L-profile seal.
Insert L -profile seal in the connector - its flat surface must face upwards.
6
to
as for connection geometry TE1.
7
8
GB
1
/
to
8
9