Transport and storage
4.1
Attachment point
Fig. 2: Attachment point EMU RZP
5
Installation
5.1
Installation methods
5.2
Stationary installation at the dis-
charge pipe
Fig. 3: Stationary installation
6
Transport and storage
▪ Attach lifting equipment directly to the flow housing.
▪ Lifting equipment must be equipped with a cable thimble.
NOTICE! Do not use shackles!
▪ Select correct elongated hole for center of gravity. Angle of inclination of recirculation
pump: approx. 5° downwards.
Attach lifting equipment
1. Loosen hexagon nut at the bolt.
2. Pull out bolt and remove plastic sleeve.
3. Slide lifting equipment over bolt.
4. Slide on plastic sleeve.
⇒ Attach lifting equipment on the bolt between two plastic sleeves.
5. Pass bolt through hole and fasten with hexagon nut.
▶ Lifting equipment attached.
▪ Stationary at the discharge pipe
▪ Flexible installation with lowering device
NOTICE! Operation at different heights and directions is not possible!
The recirculation pump's flow ring is equipped with a flange for direct attachment to the
discharge pipe. The pump is attached to the discharge pipe flange using structural engineer-
ing-approved screws. Any works can only be carried out while the basin is empty.
‡
Hoisting gear, e.g. forklift
‡
Carrier plate for lifting the pump
‡
Scaffold
‡
Fasteners
1. Position pump onto the carrier plate and secure against sliding and falling.
2. Lift the pump and position at the discharge pipe.
3. Attach the pump to the discharge pipe.
NOTICE! Ensure required strength of screws!
4. Run connection cable out of the basin under slight tension.
CAUTION! The connection cable must not be caught in the propeller!
▶ Pump installed. Have the electrical connection carried out.