Transport And Installation; Control Panel And Opertion - Klarstein 10031929 Manual De Instrucciones

Ocultar thumbs Ver también para 10031929:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

TRANSPORT AND INSTALLATION

• Do not lean the appliance over 45°when moving it to position.
• The appliance must be put on flat,firm & dry floor or similar noncombustible pad;
do not use the package foam pad.
• Do not put the appliance in the wet place.
• Do not use the appliance in the frozen place.
• Do not use the appliance outdoor in case of sunlight or rain.
• The appliance must be set with 10 cm wider space around for good ventilation; it is
normal for the housing of the cabinet getting heat when it's in operation.
• Beverage cans could be stored when you feel cooling inside after the appliance
operates around 1 hour.
Start operation
1
Before power on, clean inside of the appliance and check the drainage pipe in
good connection. For details, Please refer to the cleaning and maintenance.
2
Before power on, level the appliance on the firm & dry floor for at least 30 minutes.
3
The appliance start operation and it will cool down inside after 1 hour.

CONTROL PANEL AND OPERTION

POWER: Keep pressing the key 3 seconds, power down, goes to stand-by
mode. Keep pressing the key again 3 seconds, returns to normal working.
LIGHT: Press the key, turn on or turn off the LED lights inside. In stand-by mode,
the key is invalid.
UP: Press the key once, LED Display in regular flash showing current
set temperature. Continue pressing to adjust set temperature, one press
increase1°C. Regular flash quit after 5 seconds detecting no press and new
set temperature save. LED display return to show actual temperature inside.
EN
19
Tabla de contenido
loading

Este manual también es adecuado para:

10031930

Tabla de contenido