Fig. 3
Installation for 1 battery bank
battery timer control
battery type control
Installation for 2 battery banks
battery timer control
battery type control
engine
start battery
4 STEP CHARGE
STEP 1 - BOOST:
During this stage the
charger supplies a
maximum current and
the voltage increases
progressively according
to the battery type
selected. This step
depends on the initial
state of the batteries.
The "Fast Charge" LED
is on.
STEP 2 - ABSORPTION:
This is an adjustable
period during which the voltage is kept at its maximum and the current decreases in order to optimise the battery
charge. The "Absorption" LED is on.
STEP 3 - FLOAT:
The voltage is kept at float level in order to maintain the charge without increasing the temperature of the
batteries. They can be left connected without any damage. The "Float" LED is on.
POWERPACK function: Full current is available for on-board supply.
STEP 4 - RESET:
If the battery voltage goes down below 11.5V/23.0V, then the charge cycle starts all over again with step 1.
link
link
common
negative
domestic
battery
link
common
negative
domestic
battery
Installation for 3 battery banks
battery timer control
battery type control
engine
start battery
Sterling fuseholder
GMFB-4848
(not included)
Table 1
Cable Size Recommendation:
Charger Output
0-25 amps
25-45 amps
45-85 amps
85-125 amps
125- 180 amps
180-330 amps
Important: Two 35 sq mm cables in parallel are
equivalent to a single 70 sq mm cable.
Adjustable
common
negative
domestic
battery
Cable Length 0 - 1.5 mtr
6 sq mm
16 sq mm
25 sq mm
35 sq mm
50 sq mm
70 sq mm
English
bow thruster
battery
1.5 - 4 mtr
10 sq mm
25 sq mm
35 sq mm
50 sq mm
70 sq mm
90 sq mm
3