teko SEACHILL TK 500 Manual De Instrucciones página 12

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 27
TANK
5.2
INSTALLATION AND FUNCTIONING OF THE DEVICE
1) Do not install and do not try to repair the product if it was damaged during transport.
2) Do not connect the power cord to the power supply, unless specifi cally required.
3) In order to ensure the correct working of the device in safe conditions, it is absolutely forbidden to expose
the product to atmospheric agents and to direct heat sources (Fig. 1). The temperature of the installation
environment has to be between 5 °C and 38 °C (41 °F – 100 °F).
4) Choose the exit direction of warm air by rotating the conveyor (Rif. O Fig. 6) and fi x it by turning the screws
a quarter turn counterclockwise (Rif. Q Fig. 6) with the provided wrench (Rif. P Fig. 6).
5) If the appliance does not have to be installed inside a cabinet, skip to point 8.
6) If the device is installed inside a cabinet, open the selected wall for warm air output, while respecting the
recommended minimum distance (Fig. 7). The label provided with the appliance can be of some help (Rif.
B9 Fig. 7).
Opening position hot air outlet
S
260 mm – 10,24 in
T
74 mm – 2,91 in
U > 60 mm – 2,36 in
V
TK 500
TK 1000
TK 2000
7) In the lower area of the cabinet provide for an opening of 400 cm
the cabinet (Ref. P1 Fig. 8).
8) Lay the tubes as follows:
8.1) If necessary, insert before the squeeze-tube clamp (Ref. P2 Fig.) then the cable-tie-wrap (Ref. P3 Fig. 9).
8.2) Insert the joint ( Ref. P4 Fig. 9) in the tube, and bring cable-tie-wrap on the joint ( Ref P5 Fig. 9).
8.3) Fasten the joint clockwise (Ref. P7 Fig. 11), direct it as needed and tighten it .
8.4) When connecting the pipes, make sure that the hose from the pump (not supplied) (Ref. A1 Fig. 12-13 ) and
/ or the fi lter assembly (not supplied with the unit) ( Fig. 12 ref A2 ) is connected in the position indicated with
IN (Ref. P8 Fig. 11), the return pipe is connected to the aquarium in the position indicated with OUT (Ref.P9
Fig.11).
9) Install the unit in the chosen place allowing the visibility of the equipment.
10) Start the pump, if necessary reopen the squeeze-tube clamp (Ref. P6 Fig. 10) , make sure that the water
fl ows regularly in the circuit and that there are no leaks. In the case of anomalies or leakage in the hydraulic
circuit, review the connections.
11)
CAUTION: Make sure that the water that reaches the device is fi ltered.
12) Make sure that the power supply requirements match those shown on the technical plate, visible on the back
of the unit (Ref. A3 Fig. 4).
13) When the aquarium pump is functioning, connect the cable power supply to the power socket with the plug
(Ref. A5 Fig. 4). Then, the display will show OFF.
Pressing the power button (Ref. A7 Fig. 15) for at least 3 seconds, your device will start working, on the
display it is indicated the actual water temperature. To display the temperature to be reached press the SET
button (Ref.A8 Fig.15) to return to the water temperature press the SET button (Ref.A8 Fig.15) or wait for 5
seconds.
14)
CAUTION: A 2-minutes delay was added to prevent compressor failure at the fi rst start.
15) To stop the device, press the power button (Ref. A7 Fig. 15) for at least 3 seconds, the display will show OFF.
CAUTION: To prevent damages, the unit cannot operate without water fl ow (pump off ).
CAUTION: Connect only the TECOnnect Wi-Fi module (not supplied) to connector (Ref. A4 Fig. 4).
Do not connect any other device to this connector in order not to damage the chiller thermostat.
10
C H I L L E R L I N E
343 mm – 13,5 in
385 mm – 15,16 in
427 mm – 16,8 in
Minimum distance from walls
Z (fi lter side)
X (cable side exit)
Tab. 5-1
- 62 in
to allow the entrance of air inside
2
2
EN
30 mm – 1,18 in
50 mm – 1,97 in
Tabla de contenido
loading

Este manual también es adecuado para:

Seachill tk 1000Seachill tk 2000

Tabla de contenido