Uline H-5186 Instrucciones De Montaje página 2

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Figure 2a
C
Side
Support
Inside View
Outside View
A
C
Figure 3
C
C
Figure 4
PAGE 2 OF 6
ASSEMBLY CONTINUED
3. Connect the two upright post assemblies by inserting
Figure 2b
4. Attach the remaining front/back supports (C) at the
C
C
5. Set boards (D) on top of supports. (See Figure 4)
D
1-800-295-5510
uline.com
front/back supports (C) at the bottom, middle and top
of each upright post (A). (See Figure 2a)
NOTE: The front/back support must be inserted so
the inner v-channel is facing up. (See Figure 2b)
desired shelf levels. (See Figure 3)
NOTE: Ensure all supports are fully seated.
NOTE: Completed unit has 10 front/back supports
and six side supports.
0721 IH-5186
Tabla de contenido
loading

Tabla de contenido