Chauvet Professional Ground Support 2 Kit Guía De Referencia Rápida página 6

Ocultar thumbs Ver también para Ground Support 2 Kit:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

EN
8. Remove the pins and safety clips from the bottoms of the coupler spigots on the angling horizontal bars.
9. Loosen the locking bolts on the angling horizontal bars.
10. Insert the coupling spigots on the angling horizontal bars into the anchor pipes on the floor bases, and secure
with the pins and safety clips.
Ensure the arrows on the angling horizontal bars point in the same direction as the arrows on the
floor bases.
Each pin can only go through each coupler spigot in one direction.
If creating a curved setup, the lengths of the angling horizontal bars will need to be adjusted
accordingly. Download the User Manual from
11. Once the angling horizontal bars are secured to the floor bases, tighten the locking bolts on the angling horizontal
bars.
12. Attach the clamp on the fixed end of the angling 1M pipe to one of the main posts of the ladder truss.
13. Attach the clamp on the adjustable end of the angling 1M pipe to the paired ladder truss.
14. Verify that the angling 1M pipe is level with a bubble level tool, then tighten the wing-nuts.
5
QUICK REFERENCE GUIDE
Locking bolt
www.chauvetvideo.com
Tightening wing-nuts
for more information.
Ground Support 2 Kit QRG Rev. 4
Tabla de contenido
loading

Tabla de contenido