Kohler K-819 Guia De Instalacion página 3

Ocultar thumbs Ver también para K-819:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

4"
(10.1 cm)
10-1/8"
(25.8 cm)
1-3/16"
(3 cm)
1-1/2" Bath Drain
Roughing-In
1. Prepare the Site
NOTE: This bath can be used with a wall-mount faucet or freestanding faucet. Refer to the installation
instructions packed with the faucet for proper placement of the faucet and bath.
NOTE: This product requires through-the-floor drain installation. A drain hole will need to be cut to
accommodate the drain connections.
Plumbing
Route the plumbing according to the rough-in information.
Cap the supplies and check for leaks.
Flooring
Apply water-resistant sealant to the subfloor. This will reduce the risk of water damage.
Apply the finished flooring material prior to installing the bath.
Ensure the finished floor is level before proceeding with the bath installation.
2. Prepare the Bath
WARNING: Risk of personal injury. Wear personal protective equipment and obtain sufficient help
to carefully lift or move the bath. Cast iron baths are extremely heavy. If the cast iron bath is not
lifted properly, personal injury may occur.
NOTICE: The K-7271 (brass pipe) or K-7272 (PVC pipe) bath drain is required for this installation.
Kohler Co.
66-15/16" (170 cm)
33-1/2" (85.1 cm)
No change in measurements if connected
with drain illustrated. (K-7272)
K-819
14-1/2" (36.8 cm)
K-894
16-13/16" (42.7 cm)
7"
(17.8 cm)
2-5/8" (6.7 cm)
19-1/16"
(48.4 cm)
K-819,
17-3/8" (44.2 cm)
K-894,
22-3/4" (60.3 cm)
3
K-819
31-1/2" (80 cm)
K-894
36" (91.4 cm)
K-819, 22-3/16" (56.4 cm)
K-894, 26-15/16" (68.4 cm)
1143194-2-B
2-1/2"
(6.4 cm)
Tabla de contenido
loading

Este manual también es adecuado para:

K-894

Tabla de contenido