EN
UNIFIX – PANEL FIXING (FOLLOWING)
•
Put 4 glue threads on each underside of the mounting brackets (previously degreased).
•
Place the whole set on the fixing area previously degreased.
Respect 24 hours of drying time. Do not move or manipulate during this time.
!
During drying time, you can fix the roof-pass (product not included, cf. roof-pass part)
www.uniteck.fr
12/22