Everbilt SWJP125 Guía De Uso Y De Mantenimiento página 4

Hueco jet kit de bien
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Assembly(continued)
5.Put the O ring (A) to the front of the pump body. Insert the venturi (D) into the upper pump port. Ensure the tabs
and slots align.
6.Alternately tighten the clamp screw and tap the clamp (B) with a mallet to seat the O-ring (A).
7.Install the pipe, foot valve and well seal.
4

Capítulos

Tabla de contenido
loading

Tabla de contenido