4
TESTING
AND PUTTING INTO SERVICE
a
THE FOLLOWING CHECKS MUST BE PERFORMED IMME-
DIATELY AFTER CONNECTING THE MLPS12006 TO THE
OPERATOR.
Check that the green LED is flashing on the operator. If it is, run at
least one complete lifting and lowering manoeuvre to check that
the full operator system is working properly. If the green LED is not
flashing, the MLPS12006 may not be correctly connected; repeat
the procedure described in the section "Installation and connec-
tions".
5
MAINTENANCE
The MLPS12006 does not require any maintenance. In the event of
long periods of inactivity, disconnect it from the operator and store
it in a dry place.
Replace the batteries as shown in figure 3.
a
BEFORE
NECT THE POWER SUPPLY CONNECTOR FROM THE
MLPS12006, AS SHOWN BELOW.
a
ONLY USE THE TYPE OF BATTERIES SPECIFIED IN TA-
BLE 1.
For any clarification, please contact the Nice support service.
3
-
+
3c
Replace all removed components in the opposite order.
REPLACING
+
3d
THE
BATTERIES,
-
DISCON-
3a
3b
English – 3