PREPARATION
Before beginning assembly of product, make sure all parts are present. Compare parts with package
contents list and hardware contents list. If any part is missing or damaged, do not attempt to
assemble the product.
Estimated Installation Time: 20-30 minutes (24 hours for adhesive to dry).
Tools Required for Installation (not included): Phillips screwdriver, utility knife or scissors, adhesive,
power drill with drill bit
Helpful Tools (not included): Measuring tape, level
INSTALLATION INSTRUCTIONS
Note: Clean area where the vanity (B) will be permanently located prior to beginning installation,
ensuring the vanity (B) will not interfere with any water supply and drain lines once mounted.
Make sure to use appropriate adhesive to adhere ceramic to your installation site.
1. With two people, carefully place vanity (B) against
the wall in its final location. Find and mark
locations of wall studs behind the
permanent location of vanity (B).
WARNING
Vanity (B) MUST be secured to wall.
1
B
2
3
Lowes.com