Recess Mount Installation
1
PREPARING THE INSTALLATION LOCATION
NOTE: Before installing, make sure all parts are present.
Compare parts with the Hardware Included list. If any part is
missing or damaged, do not attempt to install the product.
□ Determine placement and mark an opening 1/2 in. taller
and wider than the cabinet (1).
□ Cut along the center of the wall studs (2).
2
FRAMING OUT THE WALL CAVITY
□ □ Mark the opening size of the framing.
□
Construct rough opening as illustrated.
Assembly
1
INSTALLING THE BINS
□ □
Insert the left system support bracket (OO) into the holes on the left side of the cabinet. Repeat on the right side (PP).
□
Place the rod track bin system bar (SS) firmly into the u-shaped channel on the system support brackets (OO, PP).
□
Hook each bin (TT, UU, VV) onto the rod track bin system bar (SS).
OO
2
INSTALLING THE SHELVES
□
Insert the left system support brackets (OO) into
the holes on the left side of the cabinet. Repeat on
the right side (PP).
□
Rest the shelves (QQ) on the system support
brackets (OO, PP).
QQ
3
PP
PP
OO
1
SECURING THE CABINET TO THE WALL
□ □ Insert the cabinet (AA) into the rough opening and make sure the cabinet
is level and plumb. (Use wood shims as required.)
□
Secure both sides of the cabinet (AA) at the designated mounting hole
locations using wood screws (not included) and washers (GG). Cover the
screws with snap caps (FF).
FF
Wood Screws
(Not Included)
OO
SS
3
PLUGGING THE EMPTY HOLES
□ □ Use the shelf hole plugs (DD) to seal the empty holes.
2
AA
TT
UU
HOMEDEPOT.COM/HOMEDECORATORS
Please contact 1-800-998-7021 for further assistance.
VV
DD