Power Conectors Kit KCP-500
5. Screw the retention ring to the connector frame and
place the shielding as indicated in picture below:
6. Screw the tail ring, pressing the shielding wires against
the retention ring, as shown in picture below:
7. To guarantee the protection degree, it is recommended
to use a heat shrinkable tube between the cable and
the tail ring:
8 | CVW500