Davey Regulmatic Instrucciones De Instalación, De Uso Y De Mantenimiento página 42

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

Installation of the probe
The probe has to be installed in vertical position, the electrical wire
being on top. Refer to drawing.
Yès
NO
A 15 mm hole has to be drilled on top
of the filtration pipe.
The part N°1 has to be glued on pipe
and the part N°2 has to be glued on
part N°1.
The probe is then threaded in part
N°2.
Refer to drawing.

Capítulos

Tabla de contenido
loading

Tabla de contenido