Kohler K-702205 Guia De Instalacion página 7

Ocultar thumbs Ver también para K-702205:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Mark holes.
Square end
of wall jamb
Level
Wall Jamb
3. Install the Wall Jambs
IMPORTANT! The wall jamb must sit flat against the wall with the legs of the jamb fully engaged with
the bottom track. The wider edge is located toward the outside of the shower.
NOTE: If the bottom corner of the ledge is rounded, the contoured ends of the jambs face down. If the
corner is square, the square ends of the jambs face down.
Determine which end of the wall jambs face down. The ends will fit into the lower corner of the
ledge where the bath/shower threshold and bath/shower wall meet.
Position the wall jamb against the wall on the bottom track.
Mark the location of the center mounting screw.
NOTE: On ceramic tile, use a center punch to nick the surface glaze at the mark. Tap the punch lightly
with your hammer so you do not crack the tile.
Remove the wall jamb, lightly center punch the hole location, and drill the screw hole using a 5/16"
drill bit. Use a masonry bit for ceramic tile.
Press and hold the leg of the anchor (provided) together and insert the anchor legs into the
pre-drilled mounting hole.
Insert an anchor in the drilled hole.
Loosely secure the wall jamb to the wall with a #8-18 x 1-1/2" panhead screw in the center hole.
Use a level to plumb the wall jamb.
Mark the remaining two hole locations.
Slide the wall jamb aside and lightly center punch the hole locations.
Drill each hole with a 5/16" drill bit. Use a masonry bit for ceramic tile.
Kohler Co.
Contoured (rounded)
end of wall jamb
Drill holes.
Insert anchors.
Press and hold legs together.
Threshold
7
Bumper
#8-18 x 1-1/2"
Panhead Screw
1054857-2-C
Tabla de contenido
loading

Este manual también es adecuado para:

K-702207K-702209K-702217

Tabla de contenido