Test The System - Quadient DS-75 Desembalar Y Instalar

Ocultar thumbs Ver también para DS-75:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 15
4.
Press the
i
button to follow the status of the connection.
5.
The initial declaration call is finished if the System status shows "Pending declaration".
6.
Press
Connect
7.
Press the
i
button to follow the status of the connection.
8.
The declaration call is finished if the System status shows "Declared".

Test the system

1.
Load document feeder trays.
2.
Load the envelope hopper.
3.
From the 'Home' menu press
Automatic.
4.
Press the
1x
button. If necessary adjust
address position, insert position and insert
fingers.
5.
Select a job and write down its fold settings.
6.
Press the
1x
button.
7.
Verify that the folds are in the correct position. If not correct, adjust it (service menu,
system
settings,
8.
Verify the flap closer quality. If not correct, adjust it (service menu,
settings,
Flap closer
Define jobs
Define any jobs according to the customer's wishes / applications.
6
again for declaration.
New
Folder
offset).
offset).
Job,
System
Tabla de contenido
loading

Este manual también es adecuado para:

M5500

Tabla de contenido