Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 29

Add Fence Fabric

Step
6
Gather (Quantity):
(5) Clips
Package of Tie Wires
Roll of Chain Link Fabric
1. Unpack the chain link fabric roll. Remove all binding materials.
2. Spread chain link fabric roll fl at on a level surface. Inspect that the wire ends are closed and tangle
free (6A).
3. Insert tension rod through the fi rst diamonds of the fabric (6B).
4. Starting on the side opposite of the tension rod, carefully roll chain link fabric towards the tension rod.
5. Start at a post next to the gate.
6. Connect the fabric to the gatepost by clipping the tension rod to the post (6C). Secure all 5 clips.
7. Unroll the fabric around all sides of the dog kennel/dog run. Loosely add a tie wire to the top frame
about every 6 feet (1.8 m) to keep the fabric from falling down (6D).
8
6A
Chain link fabric roll is heavy. Assistance is recommended.
6D
U.S. Customer Care Center 1-888-632-4453
6B
6C
Tabla de contenido
loading

Tabla de contenido