ASSEMBLY
STEP
2
Fasten
the Rail
to the Motor
Unit
• Insert a 1/4"-20xl-3/4
bolt into the cover protection
bolt hole on the back end of the rail as shown.
Tighten securely with a 1/4"-20 lock nut. Do NOT
overtighten.
• Remove the two bolts from the top of the motor
unit
• Place the "U" bracket flat side down, on the motor
unit and align the bracket holes with the bolt holes.
Fasten with the previously removed bolts.
• Align the rail assembly with the top of the motor
unit. Slide the rail end onto the "U" bracket, all the
way to the stops that protrude on the top and sides
of the bracket.
To avoid SERIOUSdamageto garage door opener,
use ONLYthose bolts/fasteners mounted in the top of
the opener.
"U" Bracket
Bolt
I
Cover
Protection
Bolt Hole _
Motor Unit
Sprocket
HARDWARE
SHOWN ACTUAL
SIZE
©
Lock Nut
Bolt 1/4"-20xl-3/4"
1/4'L20
I
I
Lock Nut
SLIDE RAIL TO STOPS
ON TOP AND SIDES
OF BRACKET
ASSEMBLY
STEP
3
Install
the
Idler
Pulley
• Lay the belt beside the rail, as shown. Grasp the
end with the hooked trolley connector and pass
approximately
12" (30 cm) of belt through the
window. Keep the ribbed side toward the rail, and
allow it to hang until Assembly Step 5.
• Remove the tape from the idler pulley. The inside
center should be pre-greased.
If dry, regrease to
ensure proper operation.
• Place the idler pulley into the window as shown.
• Insert the idler bolt from the top through the rail
and pulley. -iqghten with a 3/8" lock washer and nut
underneath the rail until the lock washer is
compressed.
• Rotate the pulley to be sure it spins freely.
• Insert a 1/4"-20xl-3/4
bolt into the trolley stop hole
in the front of the rail as shown. Tighten securely
with a 1/4"-20 lock nut.
Bolt
Connector
Idler
_
Lock
Pulley _
Nut
Idler Bolt
HARDWARE
SHOWN ACTUAL
SIZE
©
Bolt 1/4'L20x1-3/4"
Lock Nut 1/4'L20
Nut 3/8"
Lock Washer 3/8"