PF10A Installation
1.
Before installing the faucet, open the hot and
cold water supply lines for several seconds to
flush out any scale, solder, or other impurities
that would otherwise damage the faucet. Then
close the water supply stops.
2.
Ensure that rubber o-ring gasket (item 5x1) is
mounted to the base of faucet.
3.
Disassemble mounting hardware (items 6 and 7)
from the faucet.
4.
Insert the faucet body through the faucet hole.
The faucet hole must be a minimum of .875" and
a maximum of 1.375".
5.
Position faucet so that lowest (first) valve and
handle are in desired orientation.
6.
Tighten the faucet to the countertop in the
following order:
1st flat black rubber gasket (item 6x1)
2nd stainless locknut (item 7x1).
7.
Cold water stainless steel braided supply hose
(item 8x1) has been supplied with the faucet.
Connect the supply hose to the faucet using
stainless coupling nut (item 9x1).
8.
Connect cold water stainless braided supply hose
(item 8x1) to the cold water supply line.
9.
Ensure that both faucet levers are in the off
position and then turn water supply back on and
check for water tight seal. Retighten components
where necessary, but do not overtighten.
S0943
4
3
1 2
10
1 1
9
PF10A Faucet Parts
01 Handle
02 Allen Screw 2.5mm
03 Decorative Collar
04 Fluhs G1/2" C/H Cartridge
05 O-Ring
06 Flat Black Rubber Washer
4
8
5
6
7
07 Stainless Lock Nut
08 Braided Stainless Cold Water Hose
09 Stainless Coupling Nut
10 Aerator Assembly
1 1 Allen Key (2.5mm)
Item No. PF10A 01 12
1
2
3