Redflow
English Quick Start Guide ZBM
Espanol Guía de inicio rápido del ZBM
Deutsch Kurzanleitung ZBM

Capítulos

Tabla de contenido
loading

Resumen de contenidos para Redflow ZBM

  • Página 1 Redflow English Quick Start Guide ZBM Espanol Guía de inicio rápido del ZBM Deutsch Kurzanleitung ZBM...
  • Página 2 Redflow 27 Counihan Road Seventeen Mile Rocks Brisbane QLD, 4073 Australia Email: [email protected]...
  • Página 3 Conditions of use/ document Condiciones de uso / Nutzungsbedingungen / details información del documento Dokumentinformationen Redflow Gen ZBM Quick Start Guide Guía de inicio rápido del ZBM de Redflow ZBM – Kurzanleitug Document ID: Redflow S2XXD001_Quick_Start_Guide_ ID del documento: DokumentID:...
  • Página 4: Tabla De Contenido

    2.2. Module Management System (MMS) ....................4 2.3. Analog Loom ............................4 2.4. Power Cables ............................4 How to Set-up and Connect the ZBM ......................5 Safety ................................8 4.1. Gas Emissions ............................8 4.2. Electrolyte Leaks ........................... 8 4.3.
  • Página 5: About This Document

    Analog Loom and the Power Cables (for pumps and fan). These components are described in the sections below. 2.1. ZBM (Zinc Bromide Module) The ZBM flow battery is the main energy storage component of the ZBM. Its subcomponents are shown in Figure 1 below. ZBM terminals 2 x electrode stacks Gas handling units...
  • Página 6: Module Management System (Mms)

    Module Management System (MMS) The MMS contains a range of circuitry required for correct operation of the ZBM (such as the self- maintenance cycle and connections to the external system), as well as enabling communications to the ZBM via MODBUS.
  • Página 7: How To Set-Up And Connect The Zbm

    3. How to Set-up and Connect the ZBM Before using and operating a ZBM, it must be set-up by a qualified electrician and connected in the following way. See the ZBM Installation and Operating Manual for more detailed information. Step 1 Ensure the ZBM may be properly operated by checking for things such as loose fittings, damaged tubes around the system and leaks that may have occurred during transport.
  • Página 8 ON position). This will power up the MMS, and you should hear the ZBM’s fan and pumps begin operation. The ZBM needs to be in RUN Mode in order to charge and discharge for normal operation. Initiating RUN Mode can be done by writing a “1” to MODBUS register 0x9033.
  • Página 9 If the ZBM is to be stored and non-operational for long periods of time, it is recommended that it be put into Decommission Mode. If the ZBM is at a high state of charge, and will not be charged or discharged for a short period, it is recommended that it be put into Float Mode.
  • Página 10: Safety

    Electrolyte Leaks The presence of liquid electrolyte in the ZBM means that there is potential for a spill to occur. Any electrolyte leak or spill should be cleaned up in accordance with the instructions set out in the ZBM Installation and Operation Manual.
  • Página 11: Personal Protective Equipment (Ppe)

    4.3. Personal Protective Equipment (PPE) No particular PPE is required when in the vicinity of a ZBM. However, the following, or equivalent, PPE must be worn when handling electrolyte or cleaning up an electrolyte leak. • Respirator: Moldex half-face pre-assembled respirator with multi-gas/vapour cartridges (available from Protector Alsafe, www.protectoralsafe.com.au: product code 8602A,...
  • Página 12: Zbm Battery Voltage Hazard

    ZBM Battery Voltage Hazard A single ZBM can have between 0V and 57V DC on the battery terminals during operation. The voltage across the battery terminals will be 0V when it is fully discharged and it is not connected to any other power source.
  • Página 13 Manipulación de los ZBM ........................18 4.5. Almacenamiento de los ZBM ......................18 4.6. Transporte de los ZBM ........................18 4.7. Peligro de voltaje de la batería del ZBM ..................... 19 4.8. Características de seguridad contra incendios del ZBM ..............19...
  • Página 14: Acerca De Este Documento

    2.1. ZBM (Módulo de bromuro de zinc) La batería de flujo del ZBM es el principal componente de almacenamiento de energía del ZBM. Sus componentes se muestran en la Figure 1 a continuación. Terminales del...
  • Página 15: Sistema De Administración Del Módulo (Mms)

    Cables de alimentación El ZBM incluye tres cables de alimentación con conectores de UT de 5 o 3 pines que proveen potencia auxiliar de CC a la bomba de zinc, la bomba de bromo y el ventilador de enfriamiento de los ZBM.
  • Página 16: Cómo Configurar Y Conectar El Zbm

    3. Cómo configurar y conectar el ZBM Antes de utilizar y operar un ZBM, debe estar configurado por un electricista calificado y conectarse de la siguiente manera. Consulte el Manual de instalación y funcionamiento de ZBM para obtener información más detalladla.
  • Página 17 5 minutos, el ZBM conectará sus terminales al bus si el voltaje del bus es mayor a 54 VCC en caso de ZBM/ZBM2 o 59 VCC en caso de ZBM3 . Los rangos de voltaje recomendados del ZBM/ZBM2 son 52-57 VCC para la carga y 40-51 VCC para la descarga.
  • Página 18 Si el ZBM debe guardarse y no funcionar por períodos de tiempo prolongados, se recomienda ponerlo en el modo Decommission. Si el ZBM está en un estado de carga alto y no se cargará ni descargará durante un período breve, se recomienda colocarlo en modo Float. Se recomienda consultar el Manual de ClusterMonitor sobre cómo realizar estas y otras...
  • Página 19: Seguridad

    ZBM, como consecuencia de un problema operativo. Este gas se desvía automáticamente a la lata de captura de los ZBM, que atrapa los gases antes de que lleguen a áreas externas al ZBM, lo que reduce la concentración de cualquier emisión.
  • Página 20: Equipos De Protección Personal (Ppe)

    ZBM. La temperatura de los electrolitos debe mantenerse por debajo de 50 °C (113 °F. Se recomienda utilizar un recipiente secundario, como una bandeja o barrera de captura (no provisto con el ZBM) en caso de que se produzca una fuga o derrame accidental.