Step 9, Install Filters; Step 10, Finalize Installation - GE Monogram ZV750 Instrucciones De Instalación

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

9 INSTALL FILTERS
• There are two channels inside the back and front of the
hood. These channels will hold the charcoal filters and
stainless steel grease filters in place.
Install charcoal filters
• Remove protective film on the charcoal filters.
• Tip charcoal filters into the upper (top) channels at the
rear of the opening. Grasp the filter tab, lift and pull
forward until it rests in the front upper channel.
• Install all 3 charcoal filters.
Install grease filters
• Remove protective film from grease filters.
• Tip the grease filter into the lower channel at the
rear of the opening. Push back, lift and pull the knob
forward until the filter rests on the channel.
• Install all 3 grease filters.
• Turn power on. If the filter light on the control panel
glows, adjust the right-side filter in the channel to
engage the switch arm.
FINALIZE INSTALLATION
• Remove protective film covering the control panel
on the front face of the hood and any remaining
packaging materials.
• Make sure the filters are seated properly when
installed and the filter light is not on.
Installation Instructions
INSTALLATION – RECIRCULATING
Upper charcoal
filter channel
Lower charcoal
filter channel
Upper charcoal
filter channel
Lower
filter slots
• Be sure fan and lights operate correctly. Refer to
the Owner's Manual for operating instructions and
Problem Solver.
18
Grasp tab,
lift and pull forward
Tabla de contenido
loading

Este manual también es adecuado para:

Monogram zv755

Tabla de contenido