3.
Wall Panel Installation
Bottom Rail
a. Slide brackets onto bottom rail and lift into place
between posts (Fig. 4).
b. Offset bottom brackets 10" above nish grade
and center bottom rail on posts (Fig. 4).
c. Mount brackets to posts using included 4 screws
per bracket. Insert white screw head caps to hide
screws.
Vertical Tongue and Groove Boards
a. Insert vertical tongue and groove boards into
bottom rail from left to right.
b. Place U-Channel vertically on edge of tongue and
groove board #1 and #7 (Fig. 5).
Top Rail
a. Slide brackets onto top rail and place on top of
vertical tongue and groove boards (Fig. 6).
b. Mount brackets to posts using included (4) 1.5"
screws per bracket. Insert white screw head caps
to hide screws (Fig. 6).
4
10"
10"
10"
10"
10"
10"
Fig. 4
Fig. 5
U-Channel
Fig. 6
14"