Installation Instructions; To Install Stainless Steel Handle - IO Mabe IOB150BB Manual Instructivo

Centro de bebidas
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 16
INSTALATION INSTRUCTIONS
BEFORE USING YOUR BEBERAGE COOLER
Remove the exterior and interior packaging.
Check to be sure you have all of the following parts:
- 3 wired Shelves
- 2 Keys
- Stainless Steel Handle
- Instruction Manual
- 2 Extra Screws for Installing Handle
IMPORTANT:
Before connecting this Beverage cooler to a power source, let it stand upright for approximately
24 hours. This will reduce the possibility of a malfunction in the cooling system from handling
during transportation.
Clean the interior surface with lukewarm water using a soft cloth.
Install the handle on the left side of the door.

TO INSTALL STAINLESS STEEL HANDLE

Step 1
Pull away the door gasket in the area where the
handle is to be installed, as Illustration #1. The
gasket is easily removed by hand, no tools are
necessary.
Step 2
Align the handle with the pre-installed screws on
the door frame. Tighten the screws with a
screwdriver until the handles secure tightly
against the door frame, as Illustration #2. (Do
NOT over tighten as this will cause damage to
the handle assembly).
Step 3
Replace the door gasket to its original position.
Note:
This Beverage cooler includes stainless steel handles that are not required to operate this
Beverage cooler. If you choose not to use the handle supplied, simply follow step 1 to access the
pre-installed screws and remove them and then place 2 decorative plugs (NOT included) into the
two holes separately. Continue on to step 3 to replace the door gasket to its original position.
4.
Junta
Tornillo
Tornillo
Desatornillador
Manija
Tabla de contenido
loading

Este manual también es adecuado para:

Iob150ss

Tabla de contenido